নমুনা বিস্তারিত

The process shows the design of a modern landfill for household wastes.

19/07/2026 18:12 6.0 স্কোর

টপিক বা বিষয়

The process shows the design of a modern landfill for household wastes.

শব্দ সংখ্যা: 121

চার্ট/গ্রাফ

আপলোড করা চার্ট

Essay

The diagrams illustrates the process of construction a modern lanfill for household waste. Overall, the installation has three main stages, which begins with construction step and ends with closure stage. During the construction, a man-maded hole was exavated in a natural rock area. After that, the hole was covered by a clay layers, then synthetic lining before a series of drainage pipes is put in the bottom of that hole. The next stage is that trucks deposited household waste on the prepared hole. As the accumulation, the waste liquid inside flows downwards. The final stage of the construction is that the whole hole was covered again by a clay layer while a vertical pipe was installed to help gases escape safely.

সামগ্রিক স্কোর

6.0±0.5

মোটামুটি

রাইটিং মানদণ্ড স্কোর

TA6.0
CC6.0
LR6.0
GRA6.0

উন্নতির জন্য বিস্তারিত পরামর্শ দেখতে প্রবন্ধের হাইলাইট করা যেকোনো লেখায় ক্লিক করুন।

গভীর বিশ্লেষণ

Task 1 - Academic Writing

4 tools available

নমুনা রচনা - IELTS Writing Task 1

কোনো নমুনা রচনা নেই

টাস্ক ১-এর জন্য উচ্চমানের নমুনা রচনা বিশ্লেষণ এবং তৈরি করতে নিচের বাটনে ক্লিক করুন।