Sample Detail

The process shows the design of a modern landfill for household wastes.

19/07/2026 18:12 6.0 points

Topic

The process shows the design of a modern landfill for household wastes.

Word count: 121

Chart/Graph

Uploaded chart

Essay

The diagrams illustrates the process of construction a modern lanfill for household waste. Overall, the installation has three main stages, which begins with construction step and ends with closure stage. During the construction, a man-maded hole was exavated in a natural rock area. After that, the hole was covered by a clay layers, then synthetic lining before a series of drainage pipes is put in the bottom of that hole. The next stage is that trucks deposited household waste on the prepared hole. As the accumulation, the waste liquid inside flows downwards. The final stage of the construction is that the whole hole was covered again by a clay layer while a vertical pipe was installed to help gases escape safely.

Overall Scores

6.0±0.5

Fair

Writing Criteria Scores

TA6.0
CC6.0
LR6.0
GRA6.0

Click on any highlighted text in the essay to view detailed suggestions for improvement.

Deep Analysis

Task 1 - Academic Writing

4 tools available

Sample Essay - IELTS Writing Task 1

No sample essay

Click the button below to analyze and generate a high-quality sample essay for Task 1.