The diagrams illustrates the process of construction a modern lanfill for household waste. Overall, the installation has three main stages, which begins with construction step and ends with closure stage. During the construction, a man-maded hole was exavated in a natural rock area. After that, the hole was covered by a clay layers, then synthetic lining before a series of drainage pipes is put in the bottom of that hole. The next stage is that trucks deposited household waste on the prepared hole. As the accumulation, the waste liquid inside flows downwards. The final stage of the construction is that the whole hole was covered again by a clay layer while a vertical pipe was installed to help gases escape safely.
Detail Sampel
The process shows the design of a modern landfill for household wastes.
19/07/2026 18:12 6.0 skor
Topik
The process shows the design of a modern landfill for household wastes.
Jumlah kata: 121
Grafik/Diagram

Essay
Skor Keseluruhan
6.0±0.5
Cukup
Skor Kriteria Writing
TA6.0
CC6.0
LR6.0
GRA6.0
Klik teks yang ditandai di esai untuk melihat saran detail untuk peningkatan.
Analisis mendalam
Task 1 - Academic Writing
4 tools available
Esai contoh - IELTS Writing Task 1
Belum ada esai contoh
Silakan klik tombol di bawah untuk menganalisis dan membuat esai contoh berkualitas tinggi untuk Task 1.
