The given diagrams indicate the development of the area after the construction of a hydroelectric power dam. Overall, as the dam was built, there were significant changes to the usage of the area from farming to tourism, fishing, and energy extraction. Besides, the local ancient structure was removed. When the hydroelectric dam was built between two mountains in the south, it created a new lake for water storage. That required the relocation of the village along with rare species while the forest, ancient structure, and farmland must be cleared. While location of mountain remains unchanged However, this also created a new source of earnings for the locals, as the lake created a good spot for the fishing industry, and a hotel can be built for visitors and attract tourists besides the staff in the hydroelectric dam.
Detail Sampel
The maps below show the changes in area after the construction of a hydroelectric power dam. Summarise the information by selecting and reporting the main features, and make comparisons where relevant.
21/07/2026 11:20 6.0 skor
Topik
The maps below show the changes in area after the construction of a hydroelectric power dam. Summarise the information by selecting and reporting the main features, and make comparisons where relevant.
Jumlah kata: 136
Grafik/Diagram

Essay
Skor Keseluruhan
6.0±0.5
Cukup
Skor Kriteria Writing
TA6.0
CC6.0
LR6.0
GRA6.0
Klik teks yang ditandai di esai untuk melihat saran detail untuk peningkatan.
Analisis mendalam
Task 1 - Academic Writing
4 tools available
Esai contoh - IELTS Writing Task 1
Belum ada esai contoh
Silakan klik tombol di bawah untuk menganalisis dan membuat esai contoh berkualitas tinggi untuk Task 1.
