Sample Detail

The maps below show the changes in area after the construction of a hydroelectric power dam. Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

21/07/2026 11:20 6.0 points

Topic

The maps below show the changes in area after the construction of a hydroelectric power dam. Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

Word count: 136

Chart/Graph

Uploaded chart

Essay

The given diagrams indicate the development of the area after the construction of a hydroelectric power dam. Overall, as the dam was built, there were significant changes to the usage of the area from farming to tourism, fishing, and energy extraction. Besides, the local ancient structure was removed. When the hydroelectric dam was built between two mountains in the south, it created a new lake for water storage. That required the relocation of the village along with rare species while the forest, ancient structure, and farmland must be cleared. While location of mountain remains unchanged However, this also created a new source of earnings for the locals, as the lake created a good spot for the fishing industry, and a hotel can be built for visitors and attract tourists besides the staff in the hydroelectric dam.

Overall Scores

6.0±0.5

Fair

Writing Criteria Scores

TA6.0
CC6.0
LR6.0
GRA6.0

Click on any highlighted text in the essay to view detailed suggestions for improvement.

Deep Analysis

Task 1 - Academic Writing

4 tools available

Sample Essay - IELTS Writing Task 1

No sample essay

Click the button below to analyze and generate a high-quality sample essay for Task 1.