The diagram illustrates how a modern landfill for domestic garbage is constructed and utilized and ultimately closed. Overall, the process comprises three main stages. First, a large hole is dug, domestic waste is then deposited inside. Finally, the hole is sealed, and the gases are released through a separate pipe. During construction, a deep man-made hole is excavated in an area of natural rock. The interior of the pit is covered first with a layer of clay and then with a synthetic lining, which prevents waste liquid from entering the surrounding area. A series of drainage pipes is installed along the bottom and connected to a drainage tank. When the landfill is used, the trucks deposit household waste into the prepared hole. As the waste accumulates, liquid produced inside flows downwards and enters the drainage pipes. It is then carried into the tank at the base of the landfill. In the final stage, the filled landfill is covered with a thick layer of clay. A vertical pipe is also installed through the waste so that emitted gases can escape safely after the site has been closed.
Detail Sampel
The diagram shows the design of a modern landfill for household waste. Summarise the information by selecting and reporting the main features, and make comparisons where relevant.
22/07/2026 05:10 7.0 skor
Topik
The diagram shows the design of a modern landfill for household waste. Summarise the information by selecting and reporting the main features, and make comparisons where relevant.
Jumlah kata: 186
Grafik/Diagram

Essay
Skor Keseluruhan
7.0±0.5
Baik
Skor Kriteria Writing
TA7.0
CC7.0
LR7.0
GRA8.0
Klik teks yang ditandai di esai untuk melihat saran detail untuk peningkatan.
Analisis mendalam
Task 1 - Academic Writing
4 tools available
Esai contoh - IELTS Writing Task 1
Belum ada esai contoh
Silakan klik tombol di bawah untuk menganalisis dan membuat esai contoh berkualitas tinggi untuk Task 1.
