The maps illustrate the transformation of Porth Harbour from 2000 to the present day. Overall, the harbour underwent significant redevelopment with constructions of a new hotel, cafes & shops and showers being added for visitors. Regarding the north side of the harbour, while the public beach and the space of passenger ferries remain uneven throughout the period, the dock is doubled for more vessels. Additionally, the marina and the fishing boats switched positions in order to have large space for private yachts. While the showers & toilet and the car park in the north-west stayed the same, a new restroom was built to the left of the marina. Furthermore, the bigger car park now has a direct connection with the main road. Looking at the southern half, to the left of the lifeboat are new cafes and shops. In addition, the road was extended with a path leading to the hotel that is built on the former site of the castle, and the hotel also holds the control of the beach which was a public beach in 2000.
Detail Sampel
The plans below show a harbour in 2000 and how it looks today. Summarise the information by selecting and reporting the main features, and make comparisons where relevant.
22/07/2026 15:12 6.0 skor
Topik
The plans below show a harbour in 2000 and how it looks today. Summarise the information by selecting and reporting the main features, and make comparisons where relevant.
Jumlah kata: 178
Grafik/Diagram

Essay
Skor Keseluruhan
6.0±0.5
Cukup
Skor Kriteria Writing
TA6.0
CC6.0
LR6.0
GRA6.0
Klik teks yang ditandai di esai untuk melihat saran detail untuk peningkatan.
Analisis mendalam
Task 1 - Academic Writing
4 tools available
Esai contoh - IELTS Writing Task 1
Belum ada esai contoh
Silakan klik tombol di bawah untuk menganalisis dan membuat esai contoh berkualitas tinggi untuk Task 1.
